The Ontario Speed Skating Oval

The Ontario Speed Skating Oval
square Home About News Events Gallery Volunteers Links Contact Donate

Gallery

 Fall 2010 Site Work Completed 

Thanks to a donation by the Ontario Trillium Foundation some major improvements were made to the Oval site. A wider track, a larger parking lot and access road and improved site drainage will all help make the Oval a better place to skate this year.
7 images in this album
[Login]
Gallery: Ontario Speed Skating Oval navigate UP
North Trench - Pipe Laying - Looking East
North Trench - Pipe Laying - Looking East

South Side of East Radius
South Side of East Radius

South Trench By Sump Looking West Down Swale
South Trench By Sump Looking West Down Swale

Removing rock from inside track radius
Removing rock from inside track radius

Using some of the rock to level infield
Using some of the rock to level infield

Ripping rock from inside track radius
Ripping rock from inside track radius

Peeling Bedrock - Mid Point of East Radius
Peeling Bedrock - Mid Point of East Radius

Gallery: Ontario Speed Skating Oval navigate UP
Powered by Gallery v1

 

 
All content copyright © 2008 The Ontario Speed Skating Oval, all rights reserved.
Site maintained by Nexicom